How to Prepare for a Refrigerated Container Delivery

A refrigerated container delivery goes smoothly when the site is ready before the truck arrives. Whether it's for a restaurant, warehouse, or event, a little site prep and a quick call with us will help you avoid delays and complications.

At Cross Cold Storage, we deliver 20ft and 40ft refrigerated containers from our Manalapan, NJ yard to sites across New Jersey, New York City, and the Tri-State area. Here's a step-by-step guide on how to prepare for your refrigerated container delivery.

Quick Delivery Prep Checklist

  • Choose your size: 20ft or 40ft.

  • Pick a firm, level spot with good drainage.

  • Clear a straight path for the truck and check overhead clearance.

  • Have a licensed electrician confirm 3-phase power, or plan for a diesel unit.

  • Decide which way you want the doors to face.

  • Check permit or property rules if the unit will sit on a street or shared lot.

  • Have someone on site on delivery day.

Step 1: Confirm Your Requirements

Before arranging for a refrigerated container delivery, make sure you understand your needs and share them with our team. Key details to consider include:

  • Container Size: We offer 20ft and 40ft refrigerated containers. A 20ft unit suits tight lots and smaller loads. A 40ft unit holds about 2.5 times more product and suits bulk storage. Make sure you have the right amount of space for the size you've chosen.

  • Delivery Location: Identify the exact spot where you want the container placed, with enough room for the delivery truck to maneuver.

  • Power Supply: Since refrigerated containers require a power source, confirm that you have the necessary electrical connections ready for operation. Our electric units run on 3-phase power at 230V or 440V. Many smaller buildings only have single-phase service, so have a licensed electrician check your panel and hookup before delivery day. No 3-phase power on site? A diesel unit runs on its own generator (genset), so it doesn't need site power. See Electric vs. Diesel-Powered Refrigerated Containers to compare the two.

  • Access Requirements: Make sure the delivery site is accessible, free from obstructions like narrow roads, tight turns, or soft ground that could hinder truck movement.

Step 2: Prepare the Delivery Site

Get your site ready with these steps:

  • Choose a Level Surface: A firm, stable surface such as concrete, asphalt, or compacted gravel will prevent the container from shifting or sinking over time. Avoid soft lawns and muddy ground. A loaded truck can sink into wet soil, and doors can bind on a container that isn't level.

  • Plan for Drainage: Pick a spot where rainwater drains away from the container instead of pooling underneath it or in front of the doors.

  • Clear Obstacles: Remove any vehicles, debris, or structures that might obstruct the truck's path or the container placement.

  • Check Overhead Clearance: Make sure there are no low-hanging wires, tree branches, or other obstacles that could interfere with the unloading process. The truck bed rises as it tilts, so you need more overhead room at the drop spot than the container's own height.

  • Measure the Space: Double-check that the site can fit the container, with room for the doors to open fully. Plan for the footprint (20' x 8' or 40' x 8'), door swing room at one end, and a straight path for the truck to pull in and drive out. Tilt-bed delivery needs a long, straight approach, often well over twice the container's length. Send us photos or measurements and we'll confirm your site before scheduling.

  • Keep the Refrigeration Unit End Clear: The refrigeration unit sits at the opposite end from the cargo doors. Keep that end away from walls, fences, and stacked materials so the unit can move air freely and stays accessible for service.

  • Door Orientation: Decide which way the doors should face before delivery day. With tilt-bed delivery, door direction is set when the container is loaded onto the truck, so it's hard to change on site. Point the doors toward your kitchen, loading area, or work zone so your team isn't walking around the unit all day.

Step 3: Choose the Right Delivery Method

The method of delivery depends on your site conditions and accessibility:

  • Tilt-Bed Truck Delivery: The truck bed tilts, the container's end touches the ground, and the truck drives forward so the container slides into place. This is ideal for open areas with enough clearance, and it's how most of our units go out.

  • Flatbed Truck with Crane or Forklift Unloading: If you need the container placed in a tight or elevated space, a crane or forklift may be required for precise positioning. For sites without drive-in access, we arrange crane placement.

Step 4: Schedule the Delivery

Work with us to set a delivery date and time. Typical Tri-State deliveries take 3 to 5 business days, depending on unit availability, site readiness, and distance from our yard. Emergency placements can often happen within 24 to 48 hours. Consider the following factors:

  • Weather Conditions: Poor weather could complicate delivery, especially on unpaved or soft ground.

  • Road Restrictions: Check that trucks can legally and safely access your location.

  • Peak Traffic Hours: Schedule delivery during off-peak hours to avoid unnecessary delays.

  • Busy Seasons: Wedding season and the holidays keep units in demand. If you're planning for an event or wedding, book as soon as you have a date.

  • Permits and Property Rules: If the container will sit on a public street or sidewalk, check with your town or city first. In New York City, a container placed in the roadway may need a permit from NYC DOT, so check before you book. Landlords, HOAs, and co-op boards may have their own requirements too.

Step 5: Receiving the Container

On the day of delivery, be prepared for the arrival of the container:

  • Be On-Site: Have someone present to guide the driver and confirm the placement location.

  • Inspect the Container: Before signing off on the delivery, check for any visible damages that may have occurred in transit.

  • Confirm Proper Placement: Check that the container is level, secure, and positioned as per your requirements.

  • Power Up and Walkthrough: Our team connects power or starts the genset, confirms the thermostat reaches your target temperature, and walks you through the controls, doors, and defrost.

Step 6: Post-Delivery Checklist

After the container is delivered, do the following to finalize the process:

  • Secure the Doors: Make sure the doors close properly to maintain the right temperature inside the container.

  • Check the Refrigeration Unit: Confirm the set point matches your storage needs. Every unit has a programmable set point from -20°F to +70°F, covering frozen, chilled, and cool storage.

  • Load Product at Temperature: A refrigerated container is built to hold temperature, not to quickly cool warm product. Let the unit reach its set point, then load product that's already at storage temperature. Learn why this matters in The Critical Role of Temperature-Controlled Storage.

  • Leave Room for Airflow: Cold air travels through the T-grade floor and returns over the top of the load. Don't block the floor channels or stack product to the ceiling. Leave a gap at the top and near the doors so air can circulate.

  • Plan Fuel Checks for Diesel Units: Set a schedule to check fuel and top off before it runs low.

  • Communicate Any Issues: If there are concerns regarding placement or damages, call us right away at (732) 724-0650.

Frequently Asked Questions

How much space do I need for a refrigerated container delivery?

Plan for the container footprint (20' x 8' or 40' x 8'), room for the doors to open fully at one end, and a long, straight path for the tilt-bed truck. We verify your address, ground surface, clearance, and power before scheduling. See our delivery FAQs for more.

How soon can a refrigerated container be delivered?

Most Tri-State deliveries take 3 to 5 business days. Emergency placements can often happen within 24 to 48 hours, which is why businesses call us during power outages and natural disasters.

Do I need 3-phase power?

Electric units need 3-phase power at 230V or 440V. Not sure which voltage you have? A dual voltage transformer is available as an add-on. If your building only has single-phase service, a diesel unit with a genset is the simpler option. Our power FAQs cover the details.

Do I need to be on site for delivery?

It's strongly recommended. Someone on site can guide the driver, confirm placement and door direction, and go through the startup walkthrough with our team.

Can I load the container right after delivery?

Wait until the unit reaches its set point, then load product that's already cold. The container holds temperature well, but it isn't designed to pull heat out of warm product fast.

Final Thoughts

A little preparation goes a long way. Confirm your requirements, prepare the site, choose the delivery method, and have someone there on delivery day. That keeps your delivery on schedule and your container cold from day one.

Ready to schedule? Call us at (732) 724-0650 or request a free quote to rent, lease, or buy a refrigerated container anywhere in New Jersey, New York City, and the Tri-State area.

Previous
Previous

Electric vs. Diesel-Powered Refrigerated Containers: Understanding the Differences

Next
Next

The Red Sea and Suez Canal Crisis: Impact on the Shipping Container Industry